Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

195

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Packaging machinery
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IA0165 #06 Y:1997 Eliminate leaks in inert gas and compressed air lines/ valves $1,421 $167
IA0165 #05 Y:1997 Reduce the pressure of compressed air to the minimum required $1,788 $12
IA0165 #04 Y:1997 Convert to electrostatic powder coating $3,771 $2,598
IA0165 #03 Y:1997 Purchase gas directly from a contract gas supplier $9,895 $4,200
IA0165 #02 Y:1997 Replace existing equipment with more suitable substitutes $12,823 $3,500
IA0165 #01 Y:1997 Reduce scrap production $22,752 $48
WI0283 #13 Y:1996 Utilize higher efficiency lamps and/or ballasts $225 $102
WI0283 #12 Y:1996 Reduce ventilation air $319 $500
WI0283 #11 Y:1996 Utilize energy-efficient belts and other improved mechanisms $349 -
WI0283 #10 Y:1996 Replace electrically-operated equipment with fossil fuel equipment $539 $3,500
WI0283 #09 Y:1996 Combine utility meters $567 $1,000
WI0283 #08 Y:1996 Install compressor air intakes in coolest locations $431 $640
WI0283 #07 Y:1996 Eliminate leaks in inert gas and compressed air lines/ valves $674 $240
WI0283 #06 Y:1996 Install vinyl strip / high speed / air curtain doors $1,005 $608
WI0283 #05 Y:1996 Install equipment (eg compactor) to reduce disposal costs $1,835 -
WI0283 #04 Y:1996 Change procedures / equipment / operating conditions $4,200 $500
WI0283 #03 Y:1996 Use a different or recycled raw material $5,530 -
WI0283 #02 Y:1996 Purchase gas directly from a contract gas supplier $5,710 $500
WI0283 #01 Y:1996 Convert to high volume low pressure (hvlp) paint guns $9,545 $500
IA0107 #06 Y:1995 Install compressor air intakes in coolest locations $525 $149