Assessment Year | 1996 |
---|---|
Principal Product | Bottle washers and variety of sub-contract work |
NAICS |
n/a
|
SIC | 3565: Packaging Machinery |
Sales Range | $5 M to 10M |
# of Employees | 100 |
Plant Area |
95,000
ft2
|
Annual Production | 22
pieces
|
Production Hrs. Annual | 5,250
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $26,021 | 880,715 |
kWh
|
$0.030 |
Electricity Demand | $22,013 | 2,517 |
kW-mo/yr
|
$8.75 |
Electricity Fees | $4,072 | - |
|
- |
Natural Gas | $41,224 | 8,798 |
MMBtu
|
$4.69 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $30,929 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $22,027 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Gaseous Waste Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $9,545 | $500 | - | - | - | - |
$9,545
-
lb
|
- | - | - | |
02 | 2.8113: Purchase gas directly from a contract gas supplier | $5,710 | $500 | - | - | - | - | - | - | $5,710 | - | |
03 | 3.1175: Use a different or recycled raw material | $5,530 | - | - | - | - | - | - | - | - | $5,530 | |
04 | 3.1191: Change procedures / equipment / operating conditions | $4,200 | $500 | - | - | - | - | - | $4,200 | - | - | |
05 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $1,835 | - | - | - | - |
$1,835
-
lb
|
- | - | - | - | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,005 | $608 | - | - |
$1,005
-
MMBtu
|
- | - | - | - | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $674 | $240 |
$446
14,361
kWh
|
$228
-
kW-mo/yr
|
- | - | - | - | - | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $431 | $640 |
$252
8,206
kWh
|
$179
-
kW-mo/yr
|
- | - | - | - | - | - | |
09 | 2.8112: Combine utility meters | $567 | $1,000 | - | - | - | - | - | - | $567 | - | |
10 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $539 | $3,500 |
$512
16,413
kWh
|
$373
-
kW-mo/yr
|
$(-346.0)
-
MMBtu
|
- | - | - | - | - | |
11 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $349 | - |
$181
5,862
kWh
|
$168
-
kW-mo/yr
|
- | - | - | - | - | - | |
12 | 2.7314: Reduce ventilation air | $319 | $500 |
$136
4,396
kWh
|
- |
$183
-
MMBtu
|
- | - | - | - | - | |
13 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $225 | $102 |
$147
4,689
kWh
|
$78
-
kW-mo/yr
|
- | - | - | - | - | - | |
TOTAL RECOMMENDED | $30,929 | $8,090 |
$1,674
53,927
kWh
|
$1,026
-
kW-mo/yr
|
$842
-
MMBtu
|
$1,835
-
lb
|
$9,545
-
lb
|
$4,200 | $6,277 | $5,530 | ||
TOTAL IMPLEMENTED | $22,027 | $2,950 |
$910
29,308
kWh
|
$474
-
kW-mo/yr
|
$1,188
-
MMBtu
|
- |
$9,545
-
lb
|
$4,200 | $5,710 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Gaseous Waste Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs