Assessment Year | 1995 |
---|---|
Principal Product | Printed Circuit Boards |
NAICS |
n/a
|
SIC | 3672: Printed Circuit Boards |
Sales Range | $10 M to 50M |
# of Employees | 250 |
Plant Area |
40,000
ft2
|
Annual Production | 750
thousand feet
|
Production Hrs. Annual | 4,576
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $430,056 | 4,073,564 |
kWh
|
$0.11 |
Natural Gas | $184,968 | 34,340 |
MMBtu
|
$5.39 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $571,597 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $190,787 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $850 | $708 |
$850
7,913
kWh
|
- | - | - | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,130 | $4,400 |
$3,130
29,601
kWh
|
- | - | - | - | - | |
03 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $9,070 | $21,000 |
$9,070
109,906
kWh
|
- | - | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,751 | $250 |
$4,751
45,135
kWh
|
- | - | - | - | - | |
05 | 2.7241: Install outside air damper / economizer on hvac unit | $87,599 | $18,750 |
$87,599
829,719
kWh
|
- | - | - | - | - | |
06 | 2.8114: Change rate schedules or other changes in utility service | $56,940 | $140,000 |
$56,940
-
kWh
|
- | - | - | - | - | |
07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $791 | $1,680 |
$791
7,620
kWh
|
- | - | - | - | - | |
08 | 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $194,002 | $547,100 |
$427,993
4,073,564
kWh
|
$(-233,991.0)
-
MMBtu
|
- | - | - | - | |
09 | 3.1223: Use fog nozzles / spray rinsing instead of immersion rinsing | $29,556 | $3,040 | - | - |
$27,032
-
Tgal
|
$2,524
-
lb
|
- | - | |
10 | 3.1227: Use counter-current rinsing to reduce rinse water volume (gravure) | $1,680 | $3,546 | - | - |
$1,493
-
Tgal
|
- | - | $187 | |
11 | 3.1191: Change procedures / equipment / operating conditions | $5,490 | - | - | - | - |
$242
-
lb
|
- | $5,248 | |
12 | 3.1191: Change procedures / equipment / operating conditions | $177,738 | $250,240 | - | - | - | - |
$177,738
-
lb
|
- | |
TOTAL RECOMMENDED | $571,597 | $990,714 |
$591,124
5,103,458
kWh
|
$(-233,991.0)
-
MMBtu
|
$28,525
-
Tgal
|
$2,766
-
lb
|
$177,738
-
lb
|
$5,435 | ||
TOTAL IMPLEMENTED | $190,787 | $172,374 |
$154,061
919,988
kWh
|
- |
$28,525
-
Tgal
|
$2,766
-
lb
|
- | $5,435 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs