ITAC Assessment: IA0107
ITAC logo
ITAC Assessment: IA0107
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product packing equipment
NAICS
n/a
SIC 3565: Packaging Machinery
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 200,000
ft2
Annual Production 300
pieces
Production Hrs. Annual 6,720
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $221,630 4,298,652
kWh
Natural Gas $14,274 3,149
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,071 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,239

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7124: Make a practice of turning off lights when not needed $4,944 $300 $4,944
95,838
kWh
- -
02 2.7135: Install occupancy sensors $1,738 $2,999 $1,738
33,705
kWh
- -
03 2.8123: Pay utility bills on time $3,539 - - - $3,539
04 2.7491: Insulate glazing, walls, ceilings, and roofs $2,231 $1,843 - $2,231
-
MMBtu
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,094 $20 $1,094
21,102
kWh
- -
06 2.4221: Install compressor air intakes in coolest locations $525 $149 $525
10,258
kWh
- -
TOTAL RECOMMENDED $14,071 $5,311 $8,301
160,903
kWh
$2,231
-
MMBtu
$3,539
TOTAL IMPLEMENTED $11,239 $2,292 $5,469
106,096
kWh
$2,231
-
MMBtu
$3,539
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs