ITAC Assessment: MO0134
ITAC logo
ITAC Assessment: MO0134
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product honeycomb
NAICS
n/a
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 76
Plant Area 90,000
ft2
Annual Production 18,000,000
lb
Production Hrs. Annual 7,488
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $101,161 1,063,892
kWh
Natural Gas $27,978 6,784
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,352 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,541

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,184 $4,474 $6,184
65,064
kWh
-
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,768 $1,168 $3,768
39,566
kWh
-
03 2.4133: Use most efficient type of electric motors $5,895 $5,382 $5,895
62,134
kWh
-
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $694 $90 $694
7,327
kWh
-
05 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,574 $4,266 $1,931
20,223
kWh
$(-357.0)
-
MMBtu
06 2.4221: Install compressor air intakes in coolest locations $237 $350 $237
2,638
kWh
-
TOTAL RECOMMENDED $18,352 $15,730 $18,709
196,952
kWh
$(-357.0)
-
MMBtu
TOTAL IMPLEMENTED $16,541 $11,114 $16,541
174,091
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs