ITAC Assessment: SD0415
ITAC logo
ITAC Assessment: SD0415
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Optical Rotary Encoders
NAICS 335314: Relay and Industrial Control Manufacturing
SIC 3625: Relays and Industrial Controls
Sales Range $10
M
to 50
M
# of Employees 72
Plant Area 33,600
ft2
Annual Production 275,000
pieces
Production Hrs. Annual 1,700
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $86,549 968,284
kWh
Electricity Demand $50,360 2,895
kW-mo/yr
Electricity Fees $4,545 -
Natural Gas $3,296 278
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $18,418 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,611

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7232: Replace existing hvac unit with high efficiency model $6,503 $18,750 $6,503
45,990
kWh
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,780 $7,974 $4,780
53,465
kWh
- -
03 2.4226: Use / purchase optimum sized compressor $3,009 - $3,009
33,662
kWh
- -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,047 - - - $1,047
05 2.7111: Reduce illumination to minimum necessary levels $1,035 $128 $451
5,040
kWh
$584
-
kW-mo/yr
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $910 $1,000 $910
10,174
kWh
- -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $657 $5,864 $340
3,802
kWh
$317
-
kW-mo/yr
-
08 2.7145: Install skylights $323 $1,470 $323
3,611
kWh
- -
09 2.7135: Install occupancy sensors $154 $347 $154
1,727
kWh
- -
TOTAL RECOMMENDED $18,418 $35,533 $16,470
157,471
kWh
$901
-
kW-mo/yr
$1,047
TOTAL IMPLEMENTED $11,611 $20,225 $11,027
96,593
kWh
$584
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs