Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

184

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Packaging machinery
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0296 #05 Y:2025 Utilize energy-efficient belts and other improved mechanisms $209 $500
UA0296 #04 Y:2025 Reduce the pressure of compressed air to the minimum required $795 $250
UA0296 #03 Y:2025 Use photocell controls $906 $2,976
UA0296 #02 Y:2025 Optimize plant power factor $2,328 $1,262
UA0296 #01 Y:2025 Install compressor air intakes in coolest locations $9,191 $8,397
WM0238 #04 Y:2024 Reduce space conditioning during non-working hours $624 -
WM0238 #03 Y:2024 Close holes and openings in building such as broken windows $1,555 $2,185
WM0238 #02 Y:2024 Reduce the pressure of compressed air to the minimum required $1,613 -
WM0238 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $2,981 $3,250
WM0205 #07 Y:2023 Install vinyl strip / high speed / air curtain doors $367 $240
WM0205 #06 Y:2023 Install occupancy sensors $540 $148
WM0205 #05 Y:2023 Use compressor air filters $595 $2,789
WM0205 #04 Y:2023 Install compressor air intakes in coolest locations $690 $3,044
WM0205 #03 Y:2023 Utilize higher efficiency lamps and/or ballasts $1,309 $1,827
WM0205 #02 Y:2023 Use radiant heater for spot heating $3,501 $13,280
WM0205 #01 Y:2023 Reduce space conditioning during non-working hours $5,577 -
WM0193 #06 Y:2023 Close holes and openings in building such as broken windows $201 $380
WM0193 #05 Y:2023 Close holes and openings in building such as broken windows $266 $732
WM0193 #04 Y:2023 Utilize higher efficiency lamps and/or ballasts $286 $500
WM0193 #03 Y:2023 Use or replace with energy efficient substitutes $323 $1,360