Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

60

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Industrial and commercial fans and blowers and air purification equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD1087 #08 Y:2024 Reduce space conditioning during non-working hours $601 $2,093
UD1087 #07 Y:2024 Reduce illumination to minimum necessary levels $303 $900
UD1087 #06 Y:2024 Install occupancy sensors $399 $1,254
UD1087 #05 Y:2024 Optimize plant power factor $3,614 $6,258
UD1087 #04 Y:2024 Install compressor air intakes in coolest locations $452 $487
UD1087 #03 Y:2024 Reduce the pressure of compressed air to the minimum required $684 -
UD1087 #02 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,335 $1,068
UD1087 #01 Y:2024 Eliminate or reduce compressed air usage $2,975 -
UD0747 #14 Y:2006 Eliminate or reduce compressed air usage $480 $81
UD0747 #13 Y:2006 Use cooling tower or economizer to replace chiller cooling $909 $1,000
UD0747 #12 Y:2006 Utilize energy-efficient belts and other improved mechanisms $920 -
UD0747 #11 Y:2006 Eliminate leaks in inert gas and compressed air lines/ valves $1,209 $1,800
UD0747 #10 Y:2006 Utilize higher efficiency lamps and/or ballasts $2,554 $4,920
UD0747 #09 Y:2006 Reduce the pressure of compressed air to the minimum required $2,678 -
UD0747 #08 Y:2006 Install timers and/or thermostats $3,095 $760
UD0747 #07 Y:2006 Insulate bare equipment $3,215 $1,995
UD0747 #06 Y:2006 Use optimum thickness insulation $4,800 $9,030
UD0747 #05 Y:2006 Utilize higher efficiency lamps and/or ballasts $5,322 $14,256
UD0747 #04 Y:2006 Use adjustable frequency drive or multiple speed motors on existing system $20,997 $22,960
UD0747 #03 Y:2006 Use only amount of air necessary to prevent explosion hazard $23,000 $1,200