Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

718

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Industrial and commercial fans and blowers and air purification equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IP0218 #11 Y:2025 Utilize energy-efficient belts and other improved mechanisms $1,999 $4,180
IP0218 #10 Y:2025 Replace fossil fuel equipment with electrical equipment $48,200 $100,000
IP0218 #09 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $64,217 $51,340
IP0218 #08 Y:2025 Turn off equipment when not in use $4,427 $2,340
IP0218 #07 Y:2025 Turn off equipment when not in use $10,343 $3,625
IP0218 #06 Y:2025 Utilize daylight whenever possible in lieu of artificial light $22,821 $5,550
IP0218 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $4,187 $440
IP0218 #04 Y:2025 Install occupancy sensors $8,132 $700
IP0218 #03 Y:2025 Reduce space conditioning during non-working hours $4,468 $310
IP0218 #02 Y:2025 Reduce ventilation air $35,653 $3,000
IP0218 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $6,083 -
OK1160 #08 Y:2025 Conserve energy by efficient use of vending machines $474 $555
OK1160 #07 Y:2025 Optimize plant power factor $6,814 $11,190
OK1160 #06 Y:2025 Reduce the pressure of compressed air to the minimum required $959 $2,390
OK1160 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $1,352 $1,780
OK1160 #04 Y:2025 Clean and maintain refrigerant condensers and towers $1,937 $910
OK1160 #03 Y:2025 Replace existing hvac unit with high efficiency model $1,130 $8,800
OK1160 #02 Y:2025 Utilize higher efficiency lamps and/or ballasts $2,095 $2,415
OK1160 #01 Y:2025 Use solar heat to make electricty $17,376 $187,200
OK1148 #07 Y:2025 Optimize plant power factor $2,256 $2,941