3,409
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NC0483 #05 Y:2012 | 05 | 2012 | Utilize higher efficiency lamps and/or ballasts | $2,537 | $18,520 | |
| NC0483 #04 Y:2012 | 04 | 2012 | Utilize higher efficiency lamps and/or ballasts | $80,247 | $134,713 | |
| NC0483 #03 Y:2012 | 03 | 2012 | Install vinyl strip / high speed / air curtain doors | $8,715 | $20,000 | |
| NC0483 #02 Y:2012 | 02 | 2012 | Use adjustable frequency drive or multiple speed motors on existing system | $18,552 | $69,000 | |
| NC0483 #01 Y:2012 | 01 | 2012 | Replace electrically-operated equipment with fossil fuel equipment | $240,743 | $750,000 | |
| BD0422 #09 Y:2012 | 09 | 2012 | Convert to high volume low pressure (hvlp) paint guns | $17,739 | $4,600 | |
| BD0422 #08 Y:2012 | 08 | 2012 | Install compressor air intakes in coolest locations | $530 | $500 | |
| BD0422 #07 Y:2012 | 07 | 2012 | Recover waste heat from equipment | $610 | $1,000 | |
| BD0422 #06 Y:2012 | 06 | 2012 | Use synthetic lubricant | $633 | $300 | |
| BD0422 #05 Y:2012 | 05 | 2012 | Reduce the pressure of compressed air to the minimum required | $1,187 | $25 | |
| BD0422 #04 Y:2012 | 04 | 2012 | Install occupancy sensors | $2,518 | $3,225 | |
| BD0422 #03 Y:2012 | 03 | 2012 | Use synthetic lubricant | $4,219 | $4,219 | |
| BD0422 #02 Y:2012 | 02 | 2012 | Use radiant heater for spot heating | $11,658 | $28,800 | |
| BD0422 #01 Y:2012 | 01 | 2012 | Reschedule plant operations or reduce load to avoid peaks | $16,352 | $400 | |
| UA0092 #06 Y:2012 | 06 | 2012 | Use most efficient type of electric motors | $1,421 | $135 | |
| UA0092 #05 Y:2012 | 05 | 2012 | Eliminate leaks in inert gas and compressed air lines/ valves | $43,460 | $6,200 | |
| UA0092 #04 Y:2012 | 04 | 2012 | Reduce the pressure of compressed air to the minimum required | $62,047 | $15,800 | |
| UA0092 #03 Y:2012 | 03 | 2012 | Keep doors and windows shut when not on use | $25,845 | $25,121 | |
| UA0092 #02 Y:2012 | 02 | 2012 | Reduce combustion air flow to optimum | $37,964 | $77,760 | |
| UA0092 #01 Y:2012 | 01 | 2012 | Use waste heat from hot flue gases to preheat | $187,982 | $150,000 |