Assessment Year | 2013 |
---|---|
Principal Product | Tapered bearings |
NAICS | 332991: Ball and Roller Bearing Manufacturing |
SIC | 3562: Ball and Roller Bearings |
Sales Range | $50 M to 100M |
# of Employees | 285 |
Plant Area |
211,000
ft2
|
Annual Production | 200,000
pieces
|
Production Hrs. Annual | 7,800
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,135,840 | 54,384,000 |
kWh
|
$0.039 |
Electricity Demand | $751,887 | 83,424 |
kW-mo/yr
|
$9.01 |
Electricity Fees | $11,811 | - |
|
- |
Natural Gas | $225,168 | 34,915 |
MMBtu
|
$6.45 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $351,585 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $83,575 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $240,743 | $750,000 |
$406,244
10,344,888
kWh
|
$119,688
-
kW-mo/yr
|
$(-285,189.0)
-
MMBtu
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $18,552 | $69,000 |
$11,568
294,587
kWh
|
$6,984
-
kW-mo/yr
|
- | - | |
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $8,715 | $20,000 |
$5,071
127,671
kWh
|
$3,644
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $80,247 | $134,713 |
$64,302
1,637,440
kWh
|
$17,913
-
kW-mo/yr
|
- | $(-1,968.0) | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,537 | $18,520 |
$1,984
50,525
kWh
|
$553
-
kW-mo/yr
|
- | - | |
06 | 2.7124: Make a practice of turning off lights when not needed | $791 | $50 |
$619
15,755
kWh
|
$172
-
kW-mo/yr
|
- | - | |
TOTAL RECOMMENDED | $351,585 | $992,283 |
$489,788
12,470,866
kWh
|
$148,954
-
kW-mo/yr
|
$(-285,189.0)
-
MMBtu
|
$(-1,968.0) | ||
TOTAL IMPLEMENTED | $83,575 | $153,283 |
$66,905
1,703,720
kWh
|
$18,638
-
kW-mo/yr
|
- | $(-1,968.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs