Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

31

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Cutting tools, machine tool accessories, and machinists' precision measuring devices
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM0608 #07 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $2,900 $1,625
AM0608 #06 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $3,360 $65
AM0608 #05 Y:2012 Install occupancy sensors $12,691 $3,566
AM0608 #04 Y:2012 Utilize higher efficiency lamps and/or ballasts $52,200 $124,000
AM0608 #03 Y:2012 Recover and reuse waste material $144,150 $85,000
AM0608 #02 Y:2012 Replace existing hvac unit with high efficiency model $90,500 $180,000
AM0608 #01 Y:2012 Add equipment/ operators to reduce production bottleneck $1,383,679 $251,064
AM0605 #10 Y:2012 Pay utility bills on time $345 -
AM0605 #09 Y:2012 Install occupancy sensors $545 $130
AM0605 #08 Y:2012 Reduce the pressure of compressed air to the minimum required $1,940 $105
AM0605 #07 Y:2012 Utilize higher efficiency lamps and/or ballasts $2,776 $1,700
AM0605 #06 Y:2012 Eliminate or reduce compressed air usage $3,400 $4,500
AM0605 #05 Y:2012 Apply for tax-free status for energy purchases $15,800 -
AM0605 #04 Y:2012 Eliminate leaks in inert gas and compressed air lines/ valves $7,600 $500
AM0605 #03 Y:2012 Utilize higher efficiency lamps and/or ballasts $8,270 $17,600
AM0605 #02 Y:2012 Install skylights $11,600 $34,400
AM0605 #01 Y:2012 Reduce illumination to minimum necessary levels $18,020 $300
TA0074 #06 Y:2004 Install compressor air intakes in coolest locations $625 $600
TA0074 #05 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $1,504 $360
TA0074 #04 Y:2004 Make a practice of turning off lights when not needed $1,590 $43