ITAC Assessment: AM0608
ITAC logo
ITAC Assessment: AM0608
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Carbide drill bits
NAICS 333515: Cutting Tool and Machine Tool Accessory Manufacturing
SIC 3545: Cutting Tools, Machine Tool Accessories, and Machinists' Precision Measuring Devices
Sales Range $10
M
to 50
M
# of Employees 105
Plant Area 95,000
ft2
Annual Production 322,212
pieces
Production Hrs. Annual 8,424
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $593,730 10,452,982
kWh
Electricity Demand $152,481 21,264
kW-mo/yr
Electricity Fees $16,922 -
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,689,480 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,582,929

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $1,383,679 $251,064 $(-153,281.0)
(-2,670,408)
kWh
$(-25,000.0)
-
kW-mo/yr
$(-38,040.0) - $1,600,000
02 2.7232: Replace existing hvac unit with high efficiency model $90,500 $180,000 $78,000
1,345,000
kWh
$12,500
-
kW-mo/yr
- - -
03 3.5311: Recover and reuse waste material $144,150 $85,000 $(-4,705.0)
(-58,815)
kWh
$(-1,145.0)
-
kW-mo/yr
- $150,000 -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $52,200 $124,000 $44,900
782,472
kWh
$7,300
-
kW-mo/yr
- - -
05 2.7135: Install occupancy sensors $12,691 $3,566 $12,691
221,101
kWh
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,360 $65 $2,460
81,866
kWh
$900
-
kW-mo/yr
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,900 $1,625 $2,460
42,800
kWh
$440
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $1,689,480 $645,320 $(-17,475.0)
(-255,984)
kWh
$(-5,005.0)
-
kW-mo/yr
$(-38,040.0) $150,000 $1,600,000
TOTAL IMPLEMENTED $1,582,929 $461,689 $(-110,626.0)
(-1,903,951)
kWh
$(-18,405.0)
-
kW-mo/yr
$(-38,040.0) $150,000 $1,600,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs