Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

658

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Special dies and tools, die sets, jigs and fixtures, and industrial molds
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WI0282 #08 Y:1996 Eliminate leaks in inert gas and compressed air lines/ valves $212 -
WI0282 #07 Y:1996 Install compressor air intakes in coolest locations $358 $640
WI0282 #06 Y:1996 Install occupancy sensors $375 $375
WI0282 #05 Y:1996 Utilize higher efficiency lamps and/or ballasts $557 $283
WI0282 #04 Y:1996 Lower temperature during the winter season and vice-versa $1,019 -
WI0282 #03 Y:1996 Install set-back timers $2,726 $800
WI0282 #02 Y:1996 Reschedule plant operations or reduce load to avoid peaks $619 -
WI0282 #01 Y:1996 Reschedule plant operations or reduce load to avoid peaks $4,267 -
WV0095 #09 Y:1996 Lease / purchase baler; sell cardboard to recycler $11,260 $9,000
WV0095 #08 Y:1996 Improve air circulation with destratification fans / other methods $2,432 $2,800
WV0095 #07 Y:1996 Minimize use of outside make-up air for ventilation except when used for economizer cycle $8,019 $2,940
WV0095 #06 Y:1996 Turn off equipment when not in use $580 -
WV0095 #05 Y:1996 Install / repair insulation on steam lines $1,811 $2,743
WV0095 #04 Y:1996 Direct warmest air to combustion intake $534 $2,105
WV0095 #03 Y:1996 Analyze flue gas for proper air/fuel ratio $466 $700
WV0095 #02 Y:1996 Chill water to the highest temperature possible $4,565 $550
WV0095 #01 Y:1996 Use power during off-peak periods $24,235 -
WI0264 #13 Y:1996 Install equipment (eg compactor) to reduce disposal costs $3,000 $5,000
WI0264 #12 Y:1996 Recharge batteries on during off-peak demand periods $810 -
WI0264 #11 Y:1996 Install compressor air intakes in coolest locations $788 $1,500