ITAC Assessment: WI0282
ITAC logo
ITAC Assessment: WI0282
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Aluminum and zinc die casts
NAICS
n/a
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 65,000
ft2
Annual Production 100
pieces
Production Hrs. Annual 4,625
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $117,601 2,193,435
kWh
Electricity Demand $49,250 5,661
kW-mo/yr
Electricity Fees $1,564 -
Natural Gas $14,124 3,068
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,240 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,889

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,267 - - $4,339
-
kW-mo/yr
- $(-72.0)
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $619 - $551
18,171
kWh
$468
-
kW-mo/yr
- $(-400.0)
03 2.6232: Install set-back timers $2,726 $800 - - $2,726
-
MMBtu
-
04 2.7221: Lower temperature during the winter season and vice-versa $1,019 - $1,019
33,705
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $557 $283 $349
11,430
kWh
$208
-
kW-mo/yr
- -
06 2.7135: Install occupancy sensors $375 $375 $375
5,862
kWh
- - -
07 2.4221: Install compressor air intakes in coolest locations $358 $640 $216
7,034
kWh
$142
-
kW-mo/yr
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $212 - $212
7,034
kWh
- - -
09 2.2511: Insulate bare equipment $107 $149 - - $107
-
MMBtu
-
TOTAL RECOMMENDED $10,240 $2,247 $2,722
83,236
kWh
$5,157
-
kW-mo/yr
$2,833
-
MMBtu
$(-472.0)
TOTAL IMPLEMENTED $4,889 $1,458 $1,955
58,031
kWh
$208
-
kW-mo/yr
$2,726
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs