ITAC Assessment: ND0341
ITAC logo
ITAC Assessment: ND0341
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Steel Wire
NAICS
n/a
SIC 3315: Steel Wiredrawing and Steel Nails and Spikes
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 200,000
ft2
Annual Production 14,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,167 7,643,904
kWh
Electricity Demand $308,039 19,453
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $127,474 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,063

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.4151: Develop a repair/replace policy $22,377 $60,343 $5,972
538,687
kWh
$16,405
-
kW-mo/yr
- - - - -
02 2.7135: Install occupancy sensors $128 $200 $40
3,517
kWh
$88
-
kW-mo/yr
- - - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $344 $180 $344
31,067
kWh
- - - - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3 $300 $22
2,052
kWh
$44
-
kW-mo/yr
- $(-116.0) - $53 -
05 2.8121: Apply for tax-free status for energy purchases $4,719 $250 - - - - $4,719 - -
06 4.425: Eliminate/reduce redundant inspections $(-177.0) $336 - - - - $(-177.0) - -
07 4.821: Pay bills on time to avoid late fees $9,218 $250 - - $9,218
-
Tgal
- - - -
08 3.4114: Replace city water with recycled water via cooling tower $90,862 $120,000 $(-344.0)
(-31,067)
kWh
$(-946.0)
-
kW-mo/yr
- - - - $92,152
-
Tgal
TOTAL RECOMMENDED $127,474 $181,859 $6,034
544,256
kWh
$15,591
-
kW-mo/yr
$9,218
-
Tgal
$(-116.0) $4,542 $53 $92,152
-
Tgal
TOTAL IMPLEMENTED $5,063 $430 $344
31,067
kWh
- - - $4,719 - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs