ITAC Assessment: HO0205
ITAC logo
ITAC Assessment: HO0205
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Pressure-sensitive tape
NAICS
n/a
SIC 2672: Coated and Laminated Paper, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 130
Plant Area 226,000
ft2
Annual Production 1,350,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $300,190 3,679,953
kWh
Electricity Demand $86,199 9,576
kW-mo/yr
Electricity Fees $(-36,490.0) -
Natural Gas $156,848 39,152
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $69,820 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,646

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $7,922 $12,583 $5,332
65,358
kWh
$2,590
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,560 $11,408 $6,237
76,495
kWh
$1,323
-
kW-mo/yr
- - -
03 2.7111: Reduce illumination to minimum necessary levels $1,069 - $1,069
13,189
kWh
- - - -
04 2.4221: Install compressor air intakes in coolest locations $8,757 $5,030 $8,757
107,268
kWh
- - - -
05 2.2414: Use waste heat from hot flue gases to preheat $2,237 $833 - - $2,237
-
MMBtu
- -
06 2.8114: Change rate schedules or other changes in utility service $24,015 $27,500 - - - - $24,015
07 2.6231: Utilize controls to operate equipment only when needed $18,260 $24,000 - - - $18,260
-
Tgal
-
TOTAL RECOMMENDED $69,820 $81,354 $21,395
262,310
kWh
$3,913
-
kW-mo/yr
$2,237
-
MMBtu
$18,260
-
Tgal
$24,015
TOTAL IMPLEMENTED $35,646 $40,438 $16,063
196,952
kWh
$1,323
-
kW-mo/yr
- $18,260
-
Tgal
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs