Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

331

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Industrial trucks, tractors, trailers, and stackers
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IA0352 #05 Y:2004 Minimize use of outside make-up air for ventilation except when used for economizer cycle $12,016 $2
IA0352 #04 Y:2004 Recover waste heat from equipment $3,182 $1
IA0352 #03 Y:2004 Reduce the pressure of compressed air to the minimum required $5,245 $6
IA0352 #02 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $1,216 $416
IA0352 #01 Y:2004 Optimize plant power factor $3,699 $3,750
IA0343 #07 Y:2004 Add equipment/ operators to reduce production bottleneck $39,733 $10,000
IA0343 #06 Y:2004 Recover waste heat from equipment $8,859 $9,696
IA0343 #05 Y:2004 Use cooling tower or economizer to replace chiller cooling $817 $1,230
IA0343 #04 Y:2004 Use adjustable frequency drive or multiple speed motors on existing system $3,173 $7,306
IA0343 #03 Y:2004 Use most efficient type of electric motors $125 $70
IA0343 #02 Y:2004 Reduce the pressure of compressed air to the minimum required $1,120 $1,866
IA0343 #01 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $2,846 $446
MS0214 #11 Y:2002 Replace existing equipment with more suitable substitutes $38,952 $153,600
MS0214 #10 Y:2002 Convert from batch operation to continuous processing $6,462 $6,610
MS0214 #09 Y:2002 Replace electrically-operated equipment with fossil fuel equipment $557 $200
MS0214 #08 Y:2002 Lower temperature during the winter season and vice-versa $582 -
MS0214 #07 Y:2002 Install timers and/or thermostats $1,517 $1,416
MS0214 #06 Y:2002 Disconnect ballasts $1,230 $1,395
MS0214 #05 Y:2002 Install spectral reflectors / delamp $2,288 $270
MS0214 #04 Y:2002 Install timers and/or thermostats $3,765 $3,400