Assessment Year | 2004 |
---|---|
Principal Product | telescopic high-reach forklifts |
NAICS | 333924: Industrial Truck, Tractor, Trailer, and Stacker Machinery Manufacturing |
SIC | 3537: Industrial Trucks, Tractors, Trailers, and Stackers |
Sales Range | $100 M to 500M |
# of Employees | 150 |
Plant Area |
130,000
ft2
|
Annual Production | 1,650
pieces
|
Production Hrs. Annual | 6,136
hrs
|
Location (State) | South Dakota |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $71,155 | 1,982,400 |
kWh
|
$0.036 |
Electricity Demand | $52,387 | 6,720 |
kW-mo/yr
|
$7.80 |
Natural Gas | $61,881 | 8,651 |
MMBtu
|
$7.15 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $902,340 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $895,114 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $3,699 | $3,750 | - | - | $3,699 | - | - | - | - | - | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,216 | $416 |
$1,181
33,016
kWh
|
$455
-
kW-mo/yr
|
- | - | $(-420.0) | - | - | - | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $5,245 | $6 |
$2,287
63,700
kWh
|
$2,958
-
kW-mo/yr
|
- | - | - | - | - | - | |
04 | 2.2437: Recover waste heat from equipment | $3,182 | $1 | - | - | - |
$3,182
-
MMBtu
|
- | - | - | - | |
05 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $12,016 | $2 |
$419
11,658
kWh
|
$161
-
kW-mo/yr
|
- |
$11,436
-
MMBtu
|
- | - | - | - | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $528 | $136 |
$283
7,890
kWh
|
$245
-
kW-mo/yr
|
- | - | - | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,595 | $6,618 |
$3,319
92,448
kWh
|
$1,276
-
kW-mo/yr
|
- | - | - | - | - | - | |
08 | 3.7198: Reduce / eliminate use of disposable product | $4,044 | $440 | - | - | - | - | $2,800 | - | - | $1,244 | |
09 | 4.111: Add equipment/ operators to reduce production bottleneck | $867,815 | $171 | - | - | - | - | $72,800 | $44,265 | $750,750 | - | |
TOTAL RECOMMENDED | $902,340 | $11,540 |
$7,489
208,712
kWh
|
$5,095
-
kW-mo/yr
|
$3,699 |
$14,618
-
MMBtu
|
$75,180 | $44,265 | $750,750 | $1,244 | ||
TOTAL IMPLEMENTED | $895,114 | $11,099 |
$7,489
208,712
kWh
|
$5,095
-
kW-mo/yr
|
$3,699 |
$11,436
-
MMBtu
|
$72,380 | $44,265 | $750,750 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs