ITAC Assessment: UA0145
ITAC logo
ITAC Assessment: UA0145
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product snack cakes
NAICS 311812: Commercial Bakeries
SIC 2041: Flour and Other Grain Mill Products
Sales Range $100
M
to 500
M
# of Employees 360
Plant Area 280,000
ft2
Annual Production 37,000
ton
Production Hrs. Annual 6,624
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,085,546 14,950,156
kWh
Electricity Fees $238,622 -
Natural Gas $630,536 191,080
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $254,620 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,532

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $94,692 $86,201 $80,247
1,105,179
kWh
$14,445 -
02 2.7135: Install occupancy sensors $525 $822 $445
6,130
kWh
$80 -
03 2.7134: Use photocell controls $328 $61 $278
3,826
kWh
$50 -
04 2.1113: Reduce combustion air flow to optimum $20,453 $39,438 - - $20,453
-
MMBtu
05 2.4231: Reduce the pressure of compressed air to the minimum required $15,077 $800 $12,777
175,964
kWh
$2,300 -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $14,679 $2,995 $12,440
171,333
kWh
$2,239 -
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,579 $1,800 $4,728
65,119
kWh
$851 -
08 2.7261: Install timers and/or thermostats $3,588 $80 $3,041
41,883
kWh
$547 -
09 2.8121: Apply for tax-free status for energy purchases $99,699 $100 - $99,699 -
TOTAL RECOMMENDED $254,620 $132,297 $113,956
1,569,434
kWh
$120,211 $20,453
-
MMBtu
TOTAL IMPLEMENTED $15,532 $3,878 $13,163
181,289
kWh
$2,369 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs