ITAC Assessment: OD0149
ITAC logo
ITAC Assessment: OD0149
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Electronic Circuits
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 155,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,340
hrs
Location (State) Maryland

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $542,665 16,597,597
kWh
Electricity Demand $270,102 51,150
kW-mo/yr
Electricity Fees $30,817 -
Natural Gas $117,257 31,694
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,447 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.7273: Install desiccant humidity control system $26,618 $64,698 $15,340
469,226
kWh
$11,278
-
kW-mo/yr
- -
02 2.2113: Repair or replace steam traps $10,071 $450 - - $10,071
-
MMBtu
-
03 2.2628: Utilize a less expensive cooling method $1,940 $1,972 $1,940
59,203
kWh
- - -
04 3.4155: Meter waste water $3,741 $4,595 - - - $3,741
-
Tgal
05 3.4115: Recover and reuse cooling water $17,077 $10,098 - - - $17,077
-
Tgal
TOTAL RECOMMENDED $59,447 $81,813 $17,280
528,429
kWh
$11,278
-
kW-mo/yr
$10,071
-
MMBtu
$20,818
-
Tgal
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs