Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

105

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Overhead traveling cranes, hoists, and monorail systems
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0696 #07 Y:2025 Reduce the pressure of compressed air to the minimum required $545 $356
WV0696 #06 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $664 $3,172
WV0696 #05 Y:2025 Eliminate or reduce compressed air usage $1,030 $165
WV0696 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $2,542 $591
WV0696 #03 Y:2025 Install occupancy sensors $3,595 $9,464
WV0696 #02 Y:2025 Upgrade controls on compressors $6,234 $4,997
WV0696 #01 Y:2025 Filter and reuse hydraulic oil $133,648 $70,360
SU0446 #06 Y:2017 Conserve energy by efficient use of vending machines $290 $854
SU0446 #05 Y:2017 Replace heat treating oven with more efficient unit $6,295 $18,204
SU0446 #04 Y:2017 Utilize higher efficiency lamps and/or ballasts $170 $165
SU0446 #03 Y:2017 Install compressor air intakes in coolest locations $304 $234
SU0446 #02 Y:2017 Replace electrically-operated equipment with fossil fuel equipment $10,711 $7,161
SU0446 #01 Y:2017 Turn off equipment when not in use $1,759 -
IP0015 #09 Y:2013 Install outside air damper / economizer on hvac unit $1,144 $3,702
IP0015 #08 Y:2013 Optimize plant power factor $10,702 $17,052
IP0015 #07 Y:2013 Utilize higher efficiency lamps and/or ballasts $10,795 $8,625
IP0015 #06 Y:2013 Insulate bare equipment $7,093 $380
IP0015 #05 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $24,010 $1,400
IP0015 #04 Y:2013 Install occupancy sensors $1,044 $118
IP0015 #03 Y:2013 Utilize daylight whenever possible in lieu of artificial light $730 -