Assessment Year | 2013 |
---|---|
Principal Product | Truck Cranes |
NAICS | 333923: Overhead Traveling Crane, Hoist, and Monorail System Manufacturing |
SIC | 3536: Overhead Traveling Cranes, Hoists, and Monorail Systems |
Sales Range | $100 M to 500M |
# of Employees | 130 |
Plant Area |
412,000
ft2
|
Annual Production | 45
pieces
|
Production Hrs. Annual | 4,706
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $114,064 | 1,593,600 |
kWh
|
$0.072 |
Electricity Demand | $37,800 | 5,280 |
kW-mo/yr
|
$7.16 |
Electricity Fees | $9,674 | - |
|
- |
Natural Gas | $34,959 | 5,919 |
MMBtu
|
$5.91 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $58,630 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $47,488 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Water Disposal Savings | Other Liquid (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $33,800 | $3,800 |
$33,800
471,800
kWh
|
- | - | - | |
02 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $11,000 | $600 | - | - | - |
$11,000
-
gal
|
|
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $9,350 | $3,440 |
$9,350
88,330
kWh
|
- | - | - | |
04 | 2.7124: Make a practice of turning off lights when not needed | $1,900 | - |
$1,900
26,800
kWh
|
- | - | - | |
05 | 2.4314: Use synthetic lubricant | $1,105 | - |
$1,105
15,426
kWh
|
- | - | - | |
06 | 3.4151: Minimize water usage | $788 | $1,088 | - | - |
$788
-
Tgal
|
- | |
07 | 2.8121: Apply for tax-free status for energy purchases | $687 | $1,374 | - | $687 | - | - | |
TOTAL RECOMMENDED | $58,630 | $10,302 |
$46,155
602,356
kWh
|
$687 |
$788
-
Tgal
|
$11,000
-
gal
|
||
TOTAL IMPLEMENTED | $47,488 | $5,488 |
$35,700
498,600
kWh
|
- |
$788
-
Tgal
|
$11,000
-
gal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Water Disposal Savings | Other Liquid (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs