ITAC Assessment: CO0514
ITAC logo
ITAC Assessment: CO0514
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Machined silicon parts
NAICS
n/a
SIC 3674: Semiconductors and Related Devices
Sales Range $5
M
to 10
M
# of Employees 35
Plant Area 19,600
ft2
Annual Production 282,000
pieces
Production Hrs. Annual 5,200
hrs
Location (State) Montana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,352 546,320
kWh
Electricity Demand $22,721 2,829
kW-mo/yr
Electricity Fees $96 -
Natural Gas $3,102 498
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,613 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $273

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.4133: Use most efficient type of electric motors $273 $456 $196
4,849
kWh
$77
-
kW-mo/yr
- - - -
02 2.3191: Use demand controller or load shedder $1,160 $2,000 - $1,160
-
kW-mo/yr
- - - -
03 2.7135: Install occupancy sensors $510 $770 $410
10,200
kWh
$100
-
kW-mo/yr
- - - -
04 2.4226: Use / purchase optimum sized compressor $200 - $200
5,000
kWh
- - - - -
05 3.3122: Use filtration, centrifuging to remove contaminants $18,470 $30,800 - - $7,090
-
Tgal
$(-5,850.0) $14,270 $2,960
-
Tgal
TOTAL RECOMMENDED $20,613 $34,026 $806
20,049
kWh
$1,337
-
kW-mo/yr
$7,090
-
Tgal
$(-5,850.0) $14,270 $2,960
-
Tgal
TOTAL IMPLEMENTED $273 $456 $196
4,849
kWh
$77
-
kW-mo/yr
- - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs