ITAC Assessment: OR0308
ITAC logo
ITAC Assessment: OR0308
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Processed eggs
NAICS
n/a
SIC 2015: Poultry Slaughtering and Processing
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 61,425
ft2
Annual Production 16,000,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,606 2,008,499
kWh
Electricity Demand $13,774 67,896
kW-mo/yr
Electricity Fees $720 -
Natural Gas $41,287 11,275
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $76,020 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,650

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings By-product Production Savings
01 3.5317: Sell / offer by-product as animal feed $62,300 $79,000 - - $(-4,300.0)
-
MMBtu
$30,000
-
lb
$36,600
02 3.4151: Minimize water usage $72 - $41
1,465
kWh
$31
-
kW-mo/yr
- - -
03 2.6218: Turn off equipment when not in use $3,430 - $3,430
123,095
kWh
- - - -
04 2.4133: Use most efficient type of electric motors $3,148 $6,433 $2,140
76,788
kWh
$1,008
-
kW-mo/yr
- - -
05 2.1224: Replace boiler $5,250 $21,300 - - $5,250
-
MMBtu
- -
06 2.2449: Recover heat from exhausted steam, hot air or hot water $1,820 $1,945 - - $1,820
-
MMBtu
- -
TOTAL RECOMMENDED $76,020 $108,678 $5,611
201,348
kWh
$1,039
-
kW-mo/yr
$2,770
-
MMBtu
$30,000
-
lb
$36,600
TOTAL IMPLEMENTED $6,650 $6,433 $5,611
201,348
kWh
$1,039
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings By-product Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs