*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Beef Patty Processing and Packets Products
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $10
M
to 50
M
# of Employees 180
Plant Area 90,000
ft2
Annual Production 30,000,000
lb
Production Hrs. Annual 4,160
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $263,656 5,395,076
kWh
Electricity Demand $29,341 1,273
kW-mo/yr
Electricity Fees $33,725 -
Natural Gas $14,663 2,908
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $1,690,908 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
01 4.441: Install automatic packing equipment $440,000 $950,000 n/a - - - $440,000
02 4.432: Cross-train personnel to avoid lost time $22,725 $25,000 n/a - - - $22,725
03 4.514: Re-arrange equipment layout to reduce handling costs $9,450 $15,000 n/a - - - $9,450
04 4.611: Begin a practice of predictive / preventative maintenance $5,155 $3,700 n/a - - - $5,155
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,777 $3,872 n/a $1,565
28,429
kWh
$212
-
kW-mo/yr
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $116 $207 n/a $111
2,052
kWh
$5
-
kW-mo/yr
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $661 $80 n/a $620
11,137
kWh
$41
-
kW-mo/yr
- -
08 2.4133: Use most efficient type of electric motors $10,841 $13,179 n/a $10,189
184,936
kWh
$652
-
kW-mo/yr
- -
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $383 - n/a $360
6,448
kWh
$23
-
kW-mo/yr
- -
10 4.212: Adopt in-house material generation $1,024,800 $2,968,600 n/a - - $1,024,800
-
lb
-
11 3.1163: Use plastic pallets instead of wood $175,000 $56,250 n/a - - $175,000
-
lb
-
TOTAL RECOMMENDED $1,690,908 $4,035,888 $12,845
233,002
kWh
$933
-
kW-mo/yr
$1,199,800
-
lb
$477,330
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs