Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

364

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Conveyors and conveying equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0575 #09 Y:2018 Minimize water usage $510 $1,400
WV0575 #08 Y:2018 Develop a repair/replace policy $576 $558
WV0575 #07 Y:2018 Recycle white water $674 $2,000
WV0575 #06 Y:2018 Use adjustable frequency drive or multiple speed motors on existing system $715 $1,275
WV0575 #05 Y:2018 Reduce the pressure of compressed air to the minimum required $940 $70
WV0575 #04 Y:2018 Install set-back timers $1,692 $105
WV0575 #03 Y:2018 Reduce the pressure of compressed air to the minimum required $1,872 $896
WV0575 #02 Y:2018 Upgrade controls on compressors $2,374 $8,525
WV0575 #01 Y:2018 Utilize controls to operate equipment only when needed $6,365 $5,150
DL0110 #07 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $1,943 $644
DL0110 #06 Y:2013 Recover waste heat from equipment $1,991 $152
DL0110 #05 Y:2013 Utilize higher efficiency lamps and/or ballasts $2,720 $24,800
DL0110 #04 Y:2013 Reduce ventilation air $4,577 $102
DL0110 #03 Y:2013 Upgrade controls on compressors $10,321 $35,000
DL0110 #02 Y:2013 Install timers and/or thermostats $6,320 $260
DL0110 #01 Y:2013 Insulate glazing, walls, ceilings, and roofs $7,313 $39,750
LE0351 #05 Y:2012 Turn off equipment during breaks, reduce operating time $2,503 $240
LE0351 #04 Y:2012 Upgrade obsolete equipment $3,863 $10,000
LE0351 #03 Y:2012 Utilize higher efficiency lamps and/or ballasts $1,220 $6,540
LE0351 #02 Y:2012 Utilize higher efficiency lamps and/or ballasts $1,415 $4,700