ITAC Assessment: LE0351
ITAC logo
ITAC Assessment: LE0351
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Self-Guided Vehicles
NAICS 333999: All Other Miscellaneous General Purpose Machinery Manufacturing
SIC 3535: Conveyors and Conveying Equipment
Sales Range $10
M
to 50
M
# of Employees 137
Plant Area 67,200
ft2
Annual Production 1,800,000
lb
Production Hrs. Annual 2,140
hrs
Location (State) Pennsylvania

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $65,269 688,320
kWh
Electricity Demand $12,907 2,602
kW-mo/yr
Electricity Fees $14,391 -
Natural Gas $13,398 1,265
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,156 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,238

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings
01 2.7135: Install occupancy sensors $5,155 $7,480 $4,310
45,374
kWh
$670
-
kW-mo/yr
$175
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,415 $4,700 $1,325
13,951
kWh
$45
-
kW-mo/yr
$45
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,220 $6,540 $944
10,046
kWh
$276
-
kW-mo/yr
-
04 2.4321: Upgrade obsolete equipment $3,863 $10,000 $3,863
40,661
kWh
- -
05 2.6212: Turn off equipment during breaks, reduce operating time $2,503 $240 $1,943
20,449
kWh
$560
-
kW-mo/yr
-
TOTAL RECOMMENDED $14,156 $28,960 $12,385
130,481
kWh
$1,551
-
kW-mo/yr
$220
TOTAL IMPLEMENTED $10,238 $24,020 $9,117
96,081
kWh
$946
-
kW-mo/yr
$175
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs