Assessment Year | 2017 |
---|---|
Principal Product | Investment castings |
NAICS | 331512: Steel Investment Foundries |
SIC | 3324: Steel Investment Foundries |
Sales Range | $1 M to 5M |
# of Employees | 50 |
Plant Area |
43,000
ft2
|
Annual Production | 750,000
lb
|
Production Hrs. Annual | 4,335
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $226,120 | 2,303,345 |
kWh
|
$0.098 |
Electricity Demand | $17,155 | 8,572 |
kW-mo/yr
|
$2.00 |
Electricity Fees | $600 | - |
|
- |
Natural Gas | $52,351 | 14,628 |
MMBtu
|
$3.58 |
TOTAL YEARLY COSTS | $296,226 | |||
RECOMMENDED SAVINGS* | $28,990 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $15,980 | $5,000 |
$15,130
154,120
kWh
|
$850
-
kW-mo/yr
|
- | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,440 | $10,010 |
$7,040
71,730
kWh
|
$400
-
kW-mo/yr
|
- | |
03 | 2.4322: Use or replace with energy efficient substitutes | $1,790 | $660 |
$1,790
18,220
kWh
|
- | - | |
04 | 2.2113: Repair or replace steam traps | $1,470 | $180 | - | - |
$1,470
-
MMBtu
|
|
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,140 | $310 |
$1,080
11,040
kWh
|
$60
-
kW-mo/yr
|
- | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $770 | $1,360 | - | - |
$770
-
MMBtu
|
|
07 | 2.4314: Use synthetic lubricant | $400 | - |
$340
3,500
kWh
|
$60
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $28,990 | $17,520 |
$25,380
258,610
kWh
|
$1,370
-
kW-mo/yr
|
$2,240
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs