ITAC Assessment: OR0092
ITAC logo
ITAC Assessment: OR0092
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product INDUSTRIAL CERAMICS
NAICS
n/a
SIC 3299: Nonmetallic Mineral Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 280
Plant Area
n/a
Annual Production 1,227,677
lb
Production Hrs. Annual 8,736
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $201,480 4,446,073
kWh
Natural Gas $266,549 70,145
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $151,349 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $148,630

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $5,335 - - $5,335
-
MMBtu
02 2.7111: Reduce illumination to minimum necessary levels $2,064 $150 $2,064
38,687
kWh
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $120,588 - - $120,588
-
MMBtu
04 2.4133: Use most efficient type of electric motors $773 $839 $773
16,999
kWh
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $19,870 $35,000 $19,870
461,899
kWh
-
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,711 $4,175 $1,711
39,273
kWh
-
07 2.3212: Optimize plant power factor $1,008 $2,625 $1,008
-
kWh
-
TOTAL RECOMMENDED $151,349 $42,789 $25,426
556,858
kWh
$125,923
-
MMBtu
TOTAL IMPLEMENTED $148,630 $35,989 $22,707
517,585
kWh
$125,923
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs