ITAC Assessment: UD0229
ITAC logo
ITAC Assessment: UD0229
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1987
Principal Product CHEM. REAGENTS& SOLVENTS
NAICS
n/a
SIC 2869: Industrial Organic Chemicals, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 4,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $147,574 2,600,528
kWh
Natural Gas $172,856 41,802
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $24,776 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,776

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.5194: Redesign process $3,516 - $(-1,021.0)
(-2,931)
kWh
$4,177
-
MMBtu
$360
02 2.2121: Increase amount of condensate returned $7,735 $2,000 - $6,475
-
MMBtu
$1,260
03 2.2414: Use waste heat from hot flue gases to preheat $6,624 $6,000 - $6,624
-
MMBtu
-
04 2.2122: Install / repair insulation on condensate lines $1,125 $935 - $1,125
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $5,776 $20,400 $2,322
32,532
kWh
$(-228.0)
-
MMBtu
$3,682
TOTAL RECOMMENDED $24,776 $29,335 $1,301
29,601
kWh
$18,173
-
MMBtu
$5,302
TOTAL IMPLEMENTED $24,776 $29,335 $1,301
29,601
kWh
$18,173
-
MMBtu
$5,302
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs