ITAC Assessment: ND0019
ITAC logo
ITAC Assessment: ND0019
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product AUTOMOTIVE OEM PARTS
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $5
M
to 10
M
# of Employees 86
Plant Area
n/a
Annual Production 1,400,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $176,432 1,692,263
kWh
Fuel Oil #2 $4,845 917
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $10,862 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,626

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $1,236 $1,550 $1,236
12,016
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,082 $1,170 $5,608
55,393
kWh
- $(-526.0)
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,160 $200 $4,160
39,859
kWh
- -
04 2.1233: Analyze flue gas for proper air/fuel ratio $384 $400 - $384
-
MMBtu
-
TOTAL RECOMMENDED $10,862 $3,320 $11,004
107,268
kWh
$384
-
MMBtu
$(-526.0)
TOTAL IMPLEMENTED $9,626 $1,770 $9,768
95,252
kWh
$384
-
MMBtu
$(-526.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs