ITAC Assessment: AS0487
ITAC logo
ITAC Assessment: AS0487
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Insulated Conductors
NAICS 335929: Other Communication and Energy Wire Manufacturing
SIC 3357: Drawing and Insulating of Nonferrous Wire
Sales Range less than $500
k
# of Employees 78
Plant Area 100,000
ft2
Annual Production 200,000
thousand feet
Production Hrs. Annual 6,240
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $408,876 4,754,377
kWh
Electricity Demand $77,897 15,274
kW-mo/yr
TOTAL YEARLY COSTS $486,773
RECOMMENDED SAVINGS* $605,664 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings Increase in Production Savings
01 4.113: Install refrigeration system to cool product $502,983 $7,794 $(-563.0)
(-6,552)
kWh
$(-184.0)
-
kW-mo/yr
- $503,730
02 2.9114: Use solar heat to make electricty $51,986 $394,050 $46,514
747,526
kWh
$5,472
-
kW-mo/yr
- -
03 2.4322: Use or replace with energy efficient substitutes $21,819 $29,360 $18,514
215,280
kWh
$3,305
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $16,784 $10,912 $15,470
179,893
kWh
$1,217
-
kW-mo/yr
$97 -
05 2.7134: Use photocell controls $12,092 $5,188 $10,878
126,487
kWh
$1,214
-
kW-mo/yr
- -
TOTAL RECOMMENDED $605,664 $447,304 $90,813
1,262,634
kWh
$11,024
-
kW-mo/yr
$97 $503,730
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs