Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

349

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Conveyors and conveying equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0192 #07 Y:2023 Reduce the pressure of compressed air to the minimum required $136 -
WM0192 #06 Y:2023 Install compressor air intakes in coolest locations $236 $650
WM0192 #05 Y:2023 Install occupancy sensors $860 $2,040
WM0192 #04 Y:2023 Close holes and openings in building such as broken windows $1,383 $193
WM0192 #03 Y:2023 Lower temperature during the winter season and vice-versa $3,671 -
WM0192 #02 Y:2023 Utilize higher efficiency lamps and/or ballasts $4,356 $9,386
WM0192 #01 Y:2023 Improve air circulation with destratification fans / other methods $4,554 $9,300
AM0855 #07 Y:2022 Install occupancy sensors $410 $1,085
AM0855 #06 Y:2022 Eliminate or reduce compressed air usage $830 $2,100
AM0855 #05 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $1,650 $1,000
AM0855 #04 Y:2022 Turn off equipment when not in use $2,135 -
AM0855 #03 Y:2022 Reduce the pressure of compressed air to the minimum required $3,775 $2,575
AM0855 #02 Y:2022 Optimize plant power factor $7,487 $13,455
AM0855 #01 Y:2022 Apply for tax-free status for energy purchases $32,345 $5,000
AM0843 #08 Y:2022 Turn off equipment during breaks, reduce operating time $180 $160
AM0843 #07 Y:2022 Install occupancy sensors $18 $84
AM0843 #06 Y:2022 Utilize higher efficiency lamps and/or ballasts $228 $1,190
AM0843 #05 Y:2022 Install sub-metering equipment $2,741 $500
AM0843 #04 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $2,975 $3,000
AM0843 #03 Y:2022 Combine utility meters $7,115 $4,500