Assessment Year | 2025 |
---|---|
Principal Product | Bulk Material Equipment |
NAICS | 333922: Conveyor and Conveying Equipment Manufacturing |
SIC | 3535: Conveyors and Conveying Equipment |
Sales Range | $10 M to 50M |
# of Employees | 55 |
Plant Area |
90,195
ft2
|
Annual Production | 10,000
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $50,343 | 610,669 |
kWh
|
$0.082 |
Electricity Demand | $6,780 | 2,659 |
kW-mo/yr
|
$2.55 |
Electricity Fees | $5,600 | - |
|
- |
Natural Gas | $49,266 | 11,492 |
MMBtu
|
$4.29 |
TOTAL YEARLY COSTS | $111,989 | |||
RECOMMENDED SAVINGS* | $59,525 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7261: Install timers and/or thermostats | $19,297 | - |
$6,191
75,499
kWh
|
- |
$13,106
-
MMBtu
|
|
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,196 | $1,640 |
$7,859
95,843
kWh
|
$337
-
kW-mo/yr
|
- | |
03 | 2.2442: Preheat combustion air with waste heat | $15,667 | $20,000 |
$(-381.0)
(-4,655)
kWh
|
$(-69.0)
-
kW-mo/yr
|
$16,117
-
MMBtu
|
|
04 | 2.4221: Install compressor air intakes in coolest locations | $1,704 | $4,000 |
$1,646
20,563
kWh
|
$58
-
kW-mo/yr
|
- | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,724 | $13,069 |
$6,448
78,624
kWh
|
$276
-
kW-mo/yr
|
- | |
06 | 2.7232: Replace existing hvac unit with high efficiency model | $7,077 | $35,157 |
$6,842
83,430
kWh
|
$235
-
kW-mo/yr
|
- | |
07 | 2.7135: Install occupancy sensors | $133 | $479 |
$133
1,627
kWh
|
- | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $727 | $3,014 |
$617
7,522
kWh
|
$110
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $59,525 | $77,359 |
$29,355
358,453
kWh
|
$947
-
kW-mo/yr
|
$29,223
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs