Assessment Year | 2019 |
---|---|
Principal Product | Hot Mix Asphalt |
NAICS | 324121: Asphalt Paving Mixture and Block Manufacturing |
SIC | 2951: Asphalt Paving Mixtures and Blocks |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
250,000
ft2
|
Annual Production | 235,000
ton
|
Production Hrs. Annual | 3,000
hrs
|
Location (State) | South Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $90,865 | 855,574 |
kWh
|
$0.11 | |
Electricity Fees | $103 | - |
|
- | |
Natural Gas | $289,690 | 61,190 |
MMBtu
|
$4.73 | |
Waste Disposal Costs | |||||
Water Usage | $2,389 | 531 |
Tgal
|
$4.50 | |
TOTAL YEARLY COSTS | $383,047 | ||||
RECOMMENDED SAVINGS* | $10,459 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $10,459 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Water Usage Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,757 | $4,162 |
$3,757
35,447
kWh
|
- | - | - | |
02 | 3.4151: Minimize water usage | $1,166 | $1,750 | - | - | - |
$1,166
-
Tgal
|
|
03 | 2.2511: Insulate bare equipment | $5,433 | $15,806 | - | - |
$5,433
-
MMBtu
|
- | |
04 | 2.8123: Pay utility bills on time | $103 | - | - | $103 | - | - | |
TOTAL RECOMMENDED | $10,459 | $21,718 |
$3,757
35,447
kWh
|
$103 |
$5,433
-
MMBtu
|
$1,166
-
Tgal
|
||
TOTAL IMPLEMENTED | $10,459 | $21,718 |
$3,757
35,447
kWh
|
$103 |
$5,433
-
MMBtu
|
$1,166
-
Tgal
|
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs