Assessment Year | 2025 |
---|---|
Principal Product | Stamped metal parts |
NAICS | 332111: Iron and Steel Forging |
SIC | 3462: Iron and Steel Forgings |
Sales Range | $50 M to 100M |
# of Employees | 73 |
Plant Area |
344,124
ft2
|
Annual Production | 60,000,000
pieces
|
Production Hrs. Annual | 5,040
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $91,392 | 1,503,936 |
kWh
|
$0.061 |
Electricity Demand | $57,063 | 4,890 |
kW-mo/yr
|
$11.67 |
Electricity Fees | $4,492 | - |
|
- |
TOTAL YEARLY COSTS | $152,947 | |||
RECOMMENDED SAVINGS* | $150,474 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.9114: Use solar heat to make electricty | $121,083 | $551,388 |
$91,560
1,506,670
kWh
|
$29,522
-
kW-mo/yr
|
- | |
02 | 2.4234: Cool compressor air intake with heat exchanger | $9,288 | $17,929 |
$6,374
104,888
kWh
|
$2,914
-
kW-mo/yr
|
- | |
03 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $2,219 | $4,350 |
$2,219
36,508
kWh
|
- | - | |
04 | 2.7232: Replace existing hvac unit with high efficiency model | $16,588 | $55,200 |
$13,133
216,116
kWh
|
$3,455
-
kW-mo/yr
|
- | |
05 | 2.7111: Reduce illumination to minimum necessary levels | $1,297 | $728 |
$708
8,808
kWh
|
$564
-
kW-mo/yr
|
$24 | |
TOTAL RECOMMENDED | $150,474 | $629,594 |
$113,994
1,872,990
kWh
|
$36,456
-
kW-mo/yr
|
$24 | ||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs