ITAC Assessment: TR0061
ITAC logo
ITAC Assessment: TR0061
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Stamped metal parts
NAICS 332111: Iron and Steel Forging
SIC 3462: Iron and Steel Forgings
Sales Range $50
M
to 100
M
# of Employees 73
Plant Area 344,124
ft2
Annual Production 60,000,000
pieces
Production Hrs. Annual 5,040
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,392 1,503,936
kWh
Electricity Demand $57,063 4,890
kW-mo/yr
Electricity Fees $4,492 -
TOTAL YEARLY COSTS $152,947
RECOMMENDED SAVINGS* $150,474 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.9114: Use solar heat to make electricty $121,083 $551,388 $91,560
1,506,670
kWh
$29,522
-
kW-mo/yr
-
02 2.4234: Cool compressor air intake with heat exchanger $9,288 $17,929 $6,374
104,888
kWh
$2,914
-
kW-mo/yr
-
03 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $2,219 $4,350 $2,219
36,508
kWh
- -
04 2.7232: Replace existing hvac unit with high efficiency model $16,588 $55,200 $13,133
216,116
kWh
$3,455
-
kW-mo/yr
-
05 2.7111: Reduce illumination to minimum necessary levels $1,297 $728 $708
8,808
kWh
$564
-
kW-mo/yr
$24
TOTAL RECOMMENDED $150,474 $629,594 $113,994
1,872,990
kWh
$36,456
-
kW-mo/yr
$24
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs