ITAC Assessment: NL0099
ITAC logo
ITAC Assessment: NL0099
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Ready to Eat Desserts
NAICS 311412: Frozen Specialty Food Manufacturing
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $100
M
to 500
M
# of Employees 175
Plant Area 226,687
ft2
Annual Production 79,122
ton
Production Hrs. Annual 8,664
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,440,846 37,489,299
kWh
Electricity Demand $1,473,685 64,082
kW-mo/yr
Electricity Fees $24,482 -
Natural Gas $761,074 196,442
MMBtu
Fuel Oil #1 $540,000 18,725
MMBtu
Waste Disposal Costs
Water Usage $488,528 146,048
Tgal
Water Disposal $491,718 146,048
Tgal
Other Liquid (non-haz) $40,407 146,048
gal
TOTAL YEARLY COSTS $5,260,740
RECOMMENDED SAVINGS* $4,674,476 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #1 Savings One-time Revenue or Avoided Cost Savings
01 2.2622: Replace existing chiller with high efficiency model $3,986,937 $49,000,000 $247,324
6,508,485
kWh
- $540,000
-
MMBtu
$3,199,613
02 2.3212: Optimize plant power factor $569,646 $74,000 - - - $569,646
03 2.2414: Use waste heat from hot flue gases to preheat $102,668 $214,595 - $102,668
-
MMBtu
- -
04 2.2425: Use flue gases to heat process or service water $8,784 $35,100 - $8,784
-
MMBtu
- -
05 2.4239: Eliminate or reduce compressed air usage $6,201 $140 $6,201
163,160
kWh
- - -
06 2.8114: Change rate schedules or other changes in utility service $240 $35 - - - $240
TOTAL RECOMMENDED $4,674,476 $49,323,870 $253,525
6,671,645
kWh
$111,452
-
MMBtu
$540,000
-
MMBtu
$3,769,499
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #1 Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs