ITAC Assessment: AS0159
ITAC logo
ITAC Assessment: AS0159
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Polyvinyl Chloride Pipe
NAICS
n/a
SIC 3084: Plastics Pipe
Sales Range $10
M
to 50
M
# of Employees 53
Plant Area 65,000
ft2
Annual Production 55,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $459,773 7,448,711
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $74,213 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,929

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $14,313 $11,527 $14,313
260,258
kWh
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,148 - $5,148
92,907
kWh
03 2.3137: Use power during off-peak periods $7,700 $50 $7,700
-
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,333 $650 $13,333
247,948
kWh
05 2.4314: Use synthetic lubricant $5,086 $5,202 $5,086
38,980
kWh
06 2.2614: Use cooling tower or economizer to replace chiller cooling $4,366 $20,000 $4,366
93,200
kWh
07 2.2622: Replace existing chiller with high efficiency model $11,926 $31,350 $11,926
212,485
kWh
08 2.2511: Insulate bare equipment $8,844 $6,860 $8,844
163,247
kWh
09 2.7142: Utilize higher efficiency lamps and/or ballasts $3,497 $12,300 $3,497
65,064
kWh
TOTAL RECOMMENDED $74,213 $87,939 $74,213
1,174,089
kWh
TOTAL IMPLEMENTED $43,929 $29,729 $43,929
612,250
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs