ITAC Assessment: WM0192
ITAC logo
ITAC Assessment: WM0192
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Manufacturing of Conveyors
NAICS 333922: Conveyor and Conveying Equipment Manufacturing
SIC 3535: Conveyors and Conveying Equipment
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 100,000
ft2
Annual Production 1,537
units
Production Hrs. Annual 5,824
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,609 1,019,760
kWh
Electricity Demand $31,764 2,939
kW-mo/yr
Electricity Fees $18,092 -
Natural Gas $38,577 6,071
MMBtu
Waste Disposal Costs
Water Usage $16,500 276
Tgal
TOTAL YEARLY COSTS $152,542
RECOMMENDED SAVINGS* $15,196 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,546

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7243: Improve air circulation with destratification fans / other methods $4,554 $9,300 $(-447.0)
9,503
kWh
- $5,001
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,356 $9,386 $1,872
39,836
kWh
$2,484
-
kW-mo/yr
-
03 2.7221: Lower temperature during the winter season and vice-versa $3,671 - - - $3,671
-
MMBtu
04 2.7444: Close holes and openings in building such as broken windows $1,383 $193 - - $1,383
-
MMBtu
05 2.7135: Install occupancy sensors $860 $2,040 $425
9,053
kWh
$434
-
kW-mo/yr
-
06 2.4221: Install compressor air intakes in coolest locations $236 $650 $161
3,421
kWh
$76
-
kW-mo/yr
-
07 2.4231: Reduce the pressure of compressed air to the minimum required $136 - $102
2,172
kWh
$34
-
kW-mo/yr
-
TOTAL RECOMMENDED $15,196 $21,569 $2,114
63,985
kWh
$3,028
-
kW-mo/yr
$10,055
-
MMBtu
TOTAL IMPLEMENTED $9,546 $9,579 $1,974
42,008
kWh
$2,517
-
kW-mo/yr
$5,054
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs