ITAC Assessment: UM0364
ITAC logo
ITAC Assessment: UM0364
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2010
Principal Product Die Cast Dies and Injection Molds
NAICS 333514: Special Die and Tool, Die Set, Jig, and Fixture Manufacturing
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $5
M
to 10
M
# of Employees 50
Plant Area 125,304
ft2
Annual Production 50
units
Production Hrs. Annual 3,055
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,334 1,584,375
kWh
Electricity Demand $60,984 4,321
kW-mo/yr
Natural Gas $17,625 1,757
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $12,909 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,151

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4323: Use optimum size and capacity equipment $5,260 $8,716 $5,260
101,221
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $1,618 $7,917 $838
16,122
kWh
$780
-
kW-mo/yr
-
03 2.7135: Install occupancy sensors $1,498 $1,464 $1,498
28,829
kWh
- -
04 2.4221: Install compressor air intakes in coolest locations $913 $2,000 $583
11,217
kWh
$330
-
kW-mo/yr
-
05 2.2437: Recover waste heat from equipment $1,885 $5,500 - - $1,885
-
MMBtu
06 2.2437: Recover waste heat from equipment $1,735 $500 - - $1,735
-
MMBtu
TOTAL RECOMMENDED $12,909 $26,097 $8,179
157,389
kWh
$1,110
-
kW-mo/yr
$3,620
-
MMBtu
TOTAL IMPLEMENTED $6,151 $15,917 $1,421
27,339
kWh
$1,110
-
kW-mo/yr
$3,620
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs