| Assessment Year | 2010 |
|---|---|
| Principal Product | Die Cast Dies and Injection Molds |
| NAICS | 333514: Special Die and Tool, Die Set, Jig, and Fixture Manufacturing |
| SIC | 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds |
| Sales Range | $5 M to 10M |
| # of Employees | 50 |
| Plant Area |
125,304
ft2
|
| Annual Production | 50
units
|
| Production Hrs. Annual | 3,055
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $82,334 | 1,584,375 |
kWh
|
$0.052 |
| Electricity Demand | $60,984 | 4,321 |
kW-mo/yr
|
$14.11 |
| Natural Gas | $17,625 | 1,757 |
MMBtu
|
$10.03 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $12,909 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $6,151 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4323: Use optimum size and capacity equipment | $5,260 | $8,716 |
$5,260
101,221
kWh
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,618 | $7,917 |
$838
16,122
kWh
|
$780
-
kW-mo/yr
|
- | |
| 03 | 2.7135: Install occupancy sensors | $1,498 | $1,464 |
$1,498
28,829
kWh
|
- | - | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $913 | $2,000 |
$583
11,217
kWh
|
$330
-
kW-mo/yr
|
- | |
| 05 | 2.2437: Recover waste heat from equipment | $1,885 | $5,500 | - | - |
$1,885
-
MMBtu
|
|
| 06 | 2.2437: Recover waste heat from equipment | $1,735 | $500 | - | - |
$1,735
-
MMBtu
|
|
| TOTAL RECOMMENDED | $12,909 | $26,097 |
$8,179
157,389
kWh
|
$1,110
-
kW-mo/yr
|
$3,620
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $6,151 | $15,917 |
$1,421
27,339
kWh
|
$1,110
-
kW-mo/yr
|
$3,620
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs