Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

748

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Oil and gas field machinery and equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OK0966 #02 Y:2017 Base utility charges on usage rather than area occupied $113,700 $24,000
OK0966 #01 Y:2017 Replace boiler $125,000 $442,000
BD0470 #11 Y:2015 Utilize higher efficiency lamps and/or ballasts $185 $200
BD0470 #10 Y:2015 Utilize energy-efficient belts and other improved mechanisms $305 $450
BD0470 #09 Y:2015 Install occupancy sensors $911 $1,575
BD0470 #08 Y:2015 Install compressor air intakes in coolest locations $997 $450
BD0470 #07 Y:2015 Reduce the pressure of compressed air to the minimum required $1,041 $20
BD0470 #06 Y:2015 Use photocell controls $1,063 $950
BD0470 #05 Y:2015 Use most efficient type of electric motors $1,984 $2,500
BD0470 #04 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $2,232 $500
BD0470 #03 Y:2015 Utilize higher efficiency lamps and/or ballasts $2,298 $5,241
BD0470 #02 Y:2015 Utilize higher efficiency lamps and/or ballasts $2,593 $7,220
BD0470 #01 Y:2015 Replace fossil fuel equipment with electrical equipment $26,090 $30,000
OK0905 #13 Y:2014 Utilize higher efficiency lamps and/or ballasts $2,731 $8,268
OK0905 #12 Y:2014 Employ modular jigs to reduce process set-up time $1,749 $1,248
OK0905 #11 Y:2014 Replace existing hvac unit with high efficiency model $8,784 $8,940
OK0905 #10 Y:2014 Install set-back timers $3,337 $192
OK0905 #09 Y:2014 Turn off equipment when not in use $296 $476
OK0905 #08 Y:2014 Disconnect ballasts $627 $144
OK0905 #07 Y:2014 Use photocell controls $2,888 $3,680