ITAC Assessment: OK0966
ITAC logo
ITAC Assessment: OK0966
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Oil field equipment
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range greater than $500
M
# of Employees 635
Plant Area 727,191
ft2
Annual Production 1,000,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $687,451 25,461,155
kWh
Electricity Demand $417,116 107,546
kW-mo/yr
Natural Gas $748,631 119,781
MMBtu
TOTAL YEARLY COSTS $1,853,198
RECOMMENDED SAVINGS* $337,800 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $201,958

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.1224: Replace boiler $125,000 $442,000 - - - $125,000
-
MMBtu
02 2.8115: Base utility charges on usage rather than area occupied $113,700 $24,000 - - $113,700 -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $74,450 $305,694 $49,270
1,824,833
kWh
$25,180
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,526 $21,137 $2,335
86,468
kWh
$1,191
-
kW-mo/yr
- -
05 2.6218: Turn off equipment when not in use $7,886 - $5,800
214,893
kWh
$2,086
-
kW-mo/yr
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,570 $17,250 $6,570
243,310
kWh
- - -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,676 $17,550 $3,676
136,172
kWh
- - -
08 2.2514: Cover open tanks $2,956 $1,250 - - - $2,956
-
MMBtu
09 2.1131: Repair faulty insulation in furnaces, boilers, etc $36 $100 - - - $36
-
MMBtu
TOTAL RECOMMENDED $337,800 $828,981 $67,651
2,505,676
kWh
$28,457
-
kW-mo/yr
$113,700 $127,992
-
MMBtu
TOTAL IMPLEMENTED $201,958 $385,731 $61,851
2,290,783
kWh
$26,371
-
kW-mo/yr
$113,700 $36
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs