ITAC Assessment: OK0905
ITAC logo
ITAC Assessment: OK0905
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Oil field equipment
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 96
Plant Area 92,700
ft2
Annual Production 50
pieces
Production Hrs. Annual 3,250
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $72,156 907,882
kWh
Natural Gas $34,023 5,011
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,758 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,534 $2,400 $3,534
44,732
kWh
-
02 2.4322: Use or replace with energy efficient substitutes $98 $77 $98
1,236
kWh
-
03 2.4221: Install compressor air intakes in coolest locations $146 $463 $146
1,848
kWh
-
04 2.2437: Recover waste heat from equipment $468 $1,220 - $468
-
MMBtu
05 2.4226: Use / purchase optimum sized compressor $1,180 $2,817 $1,180
14,944
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $920 $2,441 $920
11,641
kWh
-
07 2.7134: Use photocell controls $2,888 $3,680 $2,888
36,551
kWh
-
08 2.7122: Disconnect ballasts $627 $144 $627
7,933
kWh
-
09 2.6218: Turn off equipment when not in use $296 $476 $296
3,744
kWh
-
10 2.6232: Install set-back timers $3,337 $192 $2,896
37,122
kWh
$441
-
MMBtu
11 2.7232: Replace existing hvac unit with high efficiency model $8,784 $8,940 $10,957
138,691
kWh
$(-2,172.8)
-
MMBtu
12 4.623: Employ modular jigs to reduce process set-up time $1,749 $1,248 $1,749
22,136
kWh
-
13 2.7142: Utilize higher efficiency lamps and/or ballasts $2,731 $8,268 $2,731
34,567
kWh
-
TOTAL RECOMMENDED $26,758 $32,366 $28,021
355,145
kWh
$(-1,263.5)
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs