Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

748

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Oil and gas field machinery and equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM0760 #05 Y:2018 Install occupancy sensors $1,121 $2,000
AM0760 #04 Y:2018 Pay utility bills on time $1,351 -
AM0760 #03 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $13,298 $1,000
AM0760 #02 Y:2018 Convert to high volume low pressure (hvlp) paint guns $13,500 $300
AM0760 #01 Y:2018 Utilize higher efficiency lamps and/or ballasts $14,161 $43,708
AM0759 #08 Y:2018 Install occupancy sensors $383 $585
AM0759 #07 Y:2018 Use synthetic lubricant $231 $100
AM0759 #06 Y:2018 Utilize daylight whenever possible in lieu of artificial light $1,207 $100
AM0759 #05 Y:2018 Eliminate or reduce compressed air usage $1,676 $700
AM0759 #04 Y:2018 Pay utility bills on time $2,702 $100
AM0759 #03 Y:2018 Reduce the pressure of compressed air to the minimum required $3,305 $100
AM0759 #02 Y:2018 Optimize plant power factor $5,714 $12,461
AM0759 #01 Y:2018 Utilize higher efficiency lamps and/or ballasts $9,939 $12,678
OK0966 #09 Y:2017 Repair faulty insulation in furnaces, boilers, etc $36 $100
OK0966 #08 Y:2017 Cover open tanks $2,956 $1,250
OK0966 #07 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $3,676 $17,550
OK0966 #06 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $6,570 $17,250
OK0966 #05 Y:2017 Turn off equipment when not in use $7,886 -
OK0966 #04 Y:2017 Utilize higher efficiency lamps and/or ballasts $3,526 $21,137
OK0966 #03 Y:2017 Utilize higher efficiency lamps and/or ballasts $74,450 $305,694