ITAC Assessment: AM0759
ITAC logo
ITAC Assessment: AM0759
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product Screen products for the oil and gas industry
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 80,000
ft2
Annual Production 371,000
units
Production Hrs. Annual 7,080
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $45,365 958,080
kWh
Electricity Demand $22,853 3,687
kW-mo/yr
Electricity Fees $3,007 -
Natural Gas $1,581 227
MMBtu
TOTAL YEARLY COSTS $72,806
RECOMMENDED SAVINGS* $25,157 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,445

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,939 $12,678 $7,626
165,421
kWh
$2,313
-
kW-mo/yr
-
02 2.3212: Optimize plant power factor $5,714 $12,461 - $5,714
-
kW-mo/yr
-
03 2.4231: Reduce the pressure of compressed air to the minimum required $3,305 $100 $2,406
52,186
kWh
$899
-
kW-mo/yr
-
04 2.8123: Pay utility bills on time $2,702 $100 - - $2,702
05 2.4239: Eliminate or reduce compressed air usage $1,676 $700 $1,676
36,364
kWh
- -
06 2.7121: Utilize daylight whenever possible in lieu of artificial light $1,207 $100 $947
20,541
kWh
$260
-
kW-mo/yr
-
07 2.4314: Use synthetic lubricant $231 $100 $151
3,270
kWh
$80
-
kW-mo/yr
-
08 2.7135: Install occupancy sensors $383 $585 $383
8,300
kWh
- -
TOTAL RECOMMENDED $25,157 $26,824 $13,189
286,082
kWh
$9,266
-
kW-mo/yr
$2,702
TOTAL IMPLEMENTED $7,445 $400 $3,504
75,997
kWh
$1,239
-
kW-mo/yr
$2,702
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs