ITAC Assessment: AM0674
ITAC logo
ITAC Assessment: AM0674
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2015
Principal Product Industrial Laundry & Sewing
NAICS 314999: All Other Miscellaneous Textile Product Mills
SIC 2326: Men's and Boys' Work Clothing
Sales Range $1
M
to 5
M
# of Employees 62
Plant Area 30,000
ft2
Annual Production 6,000,000
lb
Production Hrs. Annual 3,205
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,303 554,158
kWh
Electricity Demand $18,985 2,500
kW-mo/yr
Natural Gas $103,904 19,223
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $34,930 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,085

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2441: Preheat boiler makeup water with waste process heat $23,350 $24,500 - - $23,350
-
MMBtu
02 2.3212: Optimize plant power factor $4,070 $3,950 - $4,070
-
kW-mo/yr
-
03 2.2113: Repair or replace steam traps $2,350 $440 - - $2,350
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,420 $5 $940
14,915
kWh
$480
-
kW-mo/yr
-
05 2.1233: Analyze flue gas for proper air/fuel ratio $1,185 $500 - - $1,185
-
MMBtu
06 2.2123: Insulate feedwater tank $950 $140 - - $950
-
MMBtu
07 2.7145: Install skylights $625 $970 $625
9,900
kWh
- -
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $550 $275 $370
5,900
kWh
$180
-
kW-mo/yr
-
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $430 - $265
4,200
kWh
$165
-
kW-mo/yr
-
TOTAL RECOMMENDED $34,930 $30,780 $2,200
34,915
kWh
$4,895
-
kW-mo/yr
$27,835
-
MMBtu
TOTAL IMPLEMENTED $4,085 $1,215 $370
5,900
kWh
$180
-
kW-mo/yr
$3,535
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs