ITAC Assessment: AM0760
ITAC logo
ITAC Assessment: AM0760
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2018
Principal Product separators and pressure vessels
NAICS 333132: Oil and Gas Field Machinery and Equipment Manufacturing
SIC 3533: Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 21,000
ft2
Annual Production 100
units
Production Hrs. Annual 6,060
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $52,964 1,151,342
kWh
Electricity Demand $38,817 5,333
kW-mo/yr
Electricity Fees $(-1,593.0) -
Natural Gas $2,849 243
MMBtu
Waste Disposal Costs
Water Usage $1,587 73
Tgal
TOTAL YEARLY COSTS $94,624
RECOMMENDED SAVINGS* $44,254 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $43,133

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $14,161 $43,708 $11,886
252,891
kWh
$3,647
-
kW-mo/yr
- $1,243 $(-2,615.0)
02 3.2123: Convert to high volume low pressure (hvlp) paint guns $13,500 $300 - - - - $13,500
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,298 $1,000 $10,168
216,342
kWh
$3,130
-
kW-mo/yr
- - -
04 2.8123: Pay utility bills on time $1,351 - - - $1,351 - -
05 2.7135: Install occupancy sensors $1,121 $2,000 $1,121
23,858
kWh
- - - -
06 2.7134: Use photocell controls $823 $963 $823
17,520
kWh
- - - -
TOTAL RECOMMENDED $44,254 $47,971 $23,998
510,611
kWh
$6,777
-
kW-mo/yr
$1,351 $1,243 $10,885
TOTAL IMPLEMENTED $43,133 $45,971 $22,877
486,753
kWh
$6,777
-
kW-mo/yr
$1,351 $1,243 $10,885
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs