Assessment Year | 2018 |
---|---|
Principal Product | separators and pressure vessels |
NAICS | 333132: Oil and Gas Field Machinery and Equipment Manufacturing |
SIC | 3533: Oil and Gas Field Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 80 |
Plant Area |
21,000
ft2
|
Annual Production | 100
units
|
Production Hrs. Annual | 6,060
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $52,964 | 1,151,342 |
kWh
|
$0.046 | |
Electricity Demand | $38,817 | 5,333 |
kW-mo/yr
|
$7.28 | |
Electricity Fees | $(-1,593.0) | - |
|
- | |
Natural Gas | $2,849 | 243 |
MMBtu
|
$11.72 | |
Waste Disposal Costs | |||||
Water Usage | $1,587 | 73 |
Tgal
|
$21.82 | |
TOTAL YEARLY COSTS | $94,624 | ||||
RECOMMENDED SAVINGS* | $44,254 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $43,133 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,161 | $43,708 |
$11,886
252,891
kWh
|
$3,647
-
kW-mo/yr
|
- | $1,243 | $(-2,615.0) | |
02 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $13,500 | $300 | - | - | - | - | $13,500 | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $13,298 | $1,000 |
$10,168
216,342
kWh
|
$3,130
-
kW-mo/yr
|
- | - | - | |
04 | 2.8123: Pay utility bills on time | $1,351 | - | - | - | $1,351 | - | - | |
05 | 2.7135: Install occupancy sensors | $1,121 | $2,000 |
$1,121
23,858
kWh
|
- | - | - | - | |
06 | 2.7134: Use photocell controls | $823 | $963 |
$823
17,520
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $44,254 | $47,971 |
$23,998
510,611
kWh
|
$6,777
-
kW-mo/yr
|
$1,351 | $1,243 | $10,885 | ||
TOTAL IMPLEMENTED | $43,133 | $45,971 |
$22,877
486,753
kWh
|
$6,777
-
kW-mo/yr
|
$1,351 | $1,243 | $10,885 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs