| AM1000 #11 Y:2026 | 11 | 2026 | Reschedule plant operations or reduce load to avoid peaks | $153,338 | $140,400 |
n/a
|
| AM1000 #10 Y:2026 | 10 | 2026 | Turn off equipment when not in use | $21,976 | $3,510 |
n/a
|
| AM1000 #09 Y:2026 | 09 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $24,750 | $9,608 |
n/a
|
| AM1000 #08 Y:2026 | 08 | 2026 | Upgrade controls on compressors | $27,675 | $135 |
n/a
|
| AM1000 #07 Y:2026 | 07 | 2026 | Upgrade obsolete equipment | $37,485 | $387,620 |
n/a
|
| AM1000 #06 Y:2026 | 06 | 2026 | Reduce space conditioning during non-working hours | $8,410 | $1,080 |
n/a
|
| AM1000 #05 Y:2026 | 05 | 2026 | Recover and reuse cooling water | $11,972 | $18,367 |
n/a
|
| AM1000 #04 Y:2026 | 04 | 2026 | Meter recycled water (to reduce sewer charges) | $21,796 | $4,405 |
n/a
|
| AM1000 #03 Y:2026 | 03 | 2026 | Optimize plant power factor | $6,914 | $11,898 |
n/a
|
| AM1000 #02 Y:2026 | 02 | 2026 | Change rate schedules or other changes in utility service | $73,849 | $405 |
n/a
|
| AM1000 #01 Y:2026 | 01 | 2026 | Apply for tax-free status for energy purchases | $34,789 | $17,500 |
n/a
|
| AM0987 #05 Y:2026 | 05 | 2026 | Use solar heat to make electricty | $186,000 | $3,361,176 |
n/a
|
| AM0987 #04 Y:2026 | 04 | 2026 | Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat | $117,908 | $1,578,100 |
n/a
|
| AM0987 #03 Y:2026 | 03 | 2026 | Optimize plant power factor | $28,320 | $91,366 |
n/a
|
| AM0987 #02 Y:2026 | 02 | 2026 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,662 | $1,120 |
n/a
|
| AM0987 #01 Y:2026 | 01 | 2026 | Use adjustable frequency drive or multiple speed motors on existing system | $13,131 | $960 |
n/a
|
| LS2605 #06 Y:2026 | 06 | 2026 | Replace fossil fuel equipment with electrical equipment | $78,865 | $433,647 |
n/a
|
| LS2605 #05 Y:2026 | 05 | 2026 | Upgrade controls on compressors | $2,498 | $12,500 |
n/a
|
| LS2605 #04 Y:2026 | 04 | 2026 | Install sub-metering equipment | $6,258 | $5,250 |
n/a
|
| LS2605 #03 Y:2026 | 03 | 2026 | Clean and maintain refrigerant condensers and towers | $1,247 | $490 |