| Assessment Year | 2025 |
|---|---|
| Principal Product | Oil and Gas Tools |
| NAICS | 333132: Oil and Gas Field Machinery and Equipment Manufacturing |
| SIC | 3533: Oil and Gas Field Machinery and Equipment |
| Sales Range | $50 M to 100M |
| # of Employees | 480 |
| Plant Area |
550,000
ft2
|
| Annual Production | 40,000
units
|
| Production Hrs. Annual | 8,568
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $791,892 | 13,864,863 |
kWh
|
$0.057 |
| Electricity Demand | $343,416 | 42,502 |
kW-mo/yr
|
$8.08 |
| Electricity Fees | $358,862 | - |
|
- |
| Natural Gas | $15,429 | 1,421 |
MMBtu
|
$10.86 |
| TOTAL YEARLY COSTS | $1,509,599 | |||
| RECOMMENDED SAVINGS* | $563,826 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.9114: Use solar heat to make electricty | $89,490 | $1,237,270 |
$89,490
1,606,622
kWh
|
- | - | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $41,200 | $9,349 |
$7,800
156,500
kWh
|
$2,200
-
kW-mo/yr
|
- | $31,200 | |
| 03 | 2.8121: Apply for tax-free status for energy purchases | $280,830 | $15,000 | - | - | $70,208 | $210,622 | |
| 04 | 2.3141: Use battery storage for demand control | $35,800 | $170,380 | - |
$35,800
-
kW-mo/yr
|
- | - | |
| 05 | 2.3212: Optimize plant power factor | $30,475 | $47,407 | - |
$30,475
-
kW-mo/yr
|
- | - | |
| 06 | 2.4322: Use or replace with energy efficient substitutes | $29,000 | $4,680 |
$29,000
583,000
kWh
|
- | - | - | |
| 07 | 2.2624: Use cold waste water to cool chiller feed water | $26,500 | $2,650 |
$20,700
354,000
kWh
|
$5,800
-
kW-mo/yr
|
- | - | |
| 08 | 2.7232: Replace existing hvac unit with high efficiency model | $22,560 | $681,000 |
$9,860
197,145
kWh
|
$2,700
-
kW-mo/yr
|
- | $10,000 | |
| 09 | 2.4235: Remove or close off unneeded compressed air lines | $5,120 | $6,600 |
$3,400
61,000
kWh
|
$1,720
-
kW-mo/yr
|
- | - | |
| 10 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,010 | $30 |
$1,494
29,876
kWh
|
$516
-
kW-mo/yr
|
- | - | |
| 11 | 2.4314: Use synthetic lubricant | $841 | - |
$245
4,900
kWh
|
$596
-
kW-mo/yr
|
- | - | |
| TOTAL RECOMMENDED | $563,826 | $2,174,366 |
$161,989
2,993,043
kWh
|
$79,807
-
kW-mo/yr
|
$70,208 | $251,822 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs