Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

328

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Mining machinery and equipment, except oil and gas field machinery and equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0455 #04 Y:2014 Install timers and/or thermostats $11,689 $17,188
BD0455 #03 Y:2014 Utilize higher efficiency lamps and/or ballasts $14,997 $40,950
BD0455 #02 Y:2014 Reduce the pressure of compressed air to the minimum required $19,322 $13,700
BD0455 #01 Y:2014 Use radiant heater for spot heating $140,934 $105,000
BS0033 #10 Y:2014 Install timers and/or thermostats $21,246 $1,547
BS0033 #09 Y:2014 Utilize higher efficiency lamps and/or ballasts $33 $160
BS0033 #08 Y:2014 Utilize higher efficiency lamps and/or ballasts $1,767 $23,688
BS0033 #07 Y:2014 Install occupancy sensors $2,179 $360
BS0033 #06 Y:2014 Use proper thickness of insulation on building envelope $2,800 $2,668
BS0033 #05 Y:2014 Improve air circulation with destratification fans / other methods $4,302 $17,525
BS0033 #04 Y:2014 Turn off equipment when not in use $464 $10
BS0033 #03 Y:2014 Install compressor air intakes in coolest locations $263 $168
BS0033 #02 Y:2014 Reduce the pressure of compressed air to the minimum required $1,073 $15
BS0033 #01 Y:2014 Install steam trap $123 $217
OR0608 #07 Y:2013 Use photocell controls $658 $966
OR0608 #06 Y:2013 Install desiccant humidity control system $2,698 $1,220
OR0608 #05 Y:2013 Insulate bare equipment $518 $135
OR0608 #04 Y:2013 Adjust / maintain fork lift trucks for most efficient operation $11,970 $41,000
OR0608 #03 Y:2013 Add/modify equipment to improve drying process $125,546 $300,000
OR0608 #02 Y:2013 Add equipment/ operators to reduce production bottleneck $107,138 $55,641